Bracken Ridge, Queensland Telegraph Road Upgrade Stage 2 connects directly into Stage 1B (Norris Road to Mustang Street). Works included the construction of a four-lane median-divided carriageway from Mustang Street to the Gateway Motorway on/off ramps (including additional through lanes and turn lanes); removal of the existing roundabout and installation of traffic signals; construction of … Continue reading Telegraph Road Stage 2
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed