    Telegraph Road Stage 2

    Telegraph Road Stage 2

    Bracken Ridge, Queensland

    Telegraph Road Upgrade Stage 2 connects directly into Stage 1B (Norris Road to Mustang Street).

    Works included the construction of a four-lane median-divided carriageway from Mustang Street to the Gateway Motorway on/off ramps (including additional through lanes and turn lanes); removal of the existing roundabout and installation of traffic signals; construction of a four-lane median-divided carriageway at Lemke Road from Telegraph Road to Tallowwood Place, with double right-turn lanes and a four-lane bridge; U-turn facilities; parking bays; new shared pathways, path linkages and cycle lanes; new street lighting and the upgrade of the cyclist/pedestrian underpass on Depot Road.

    In addition to the construction works, the team will need to take fauna movement measures, including the installation of a fauna underpass/glider poles, landscaping and re-vegetation works.

    Once complete the works will improve safety, travel times, facilities for pedestrian and cyclists, road flood immunity and cater for existing and future traffic demands in the area to reduce congestion.

    The $38.8 million project was jointly funded by Brisbane City Council and the Australia Government.