Key Projects




    BP Fuel Oil barge

    BP Fuel Oil barge

    Pinkenba, Queensland

    British Petroleum’s processing plant located on the down-stream reaches of the Brisbane River required a new Fuel Oil Barge Wharf as part of its development and expansion. The scope of works included 28 raked and 9 vertical piles, cast in-situ concrete load out platform and 4 berthing dolphins. The project was constructed alongside the soon to be replaced active petroleum load out facility that required strict safety and environmental procedures during the construction phase.

    EXEGEN was the sole surveyor involved in this project.