Key Projects




    AJ Wyllie Bridge

    AJ Wyllie Bridge

    Petrie, Queensland

    The replacement of the North Pine River (AJ Wyllie) Bridge involved demolishing the existing northbound bridge structure and reconstructing a new replacement bridge on the same alignment. The replacement bridge was required due to the damage sustained to the existing bridge following Brisbane’s flooding events in January 2011.

    EXEGEN was the sole surveyor involved in this project, with the bridge demolished and replaced with a new four span, 110 metre long dual carriage way bridge.